Heshida Quick Drying Environmental Friendly Floor Paint

Hello, come to consult our products !

Heshida Quick Drying Environmental Friendly Floor Paint

Heshida Dry Powder Floor Paint Use International Innovative Formula,No Pollution To Indoor And Outdoor Environment.The Product Has Strong Covering Power And Adhesion, High Hardness, And Excellent Oil Resistance, Water Resistance, Moisture Resistance And Corrosion Resistance, And Fire Resistance Grade A1. Good Color Retention, Long Service Life.


Product Detail

FAQ

Product Tags

Practical Coverage: 90-100 Square Meter / 10kgs
Gloss:Highlight Gloss
Surface Dry: Thirty~Fifty (30~50) Minutes.
Overcoating Interval: Allow Thirty~Fifty(30~50)Minutes Before Recoating.
Dry Through: Five(5) Days
Dry Film Thickness: 1.5mm/Coat
Application Method: Paint Brush, Roller Or Airless Spray.
Packaging:5kgs/Bag,2bags/Bucket
Thinning: The Ratio Of Powder To Water Is 1:1.4 ~ 1:1.6.
Available Colors: There Are 9 Basic Colors, Can Use These 9 Basic Colors With Different Formula To Get Any Color You Want.

Description:
Heshida Dry Powder Floor Paint Use International Innovative Formula,No Pollution To Indoor And Outdoor Environment.The Product Has Strong Covering Power And Adhesion, High Hardness, And Excellent Oil Resistance, Water Resistance, Moisture Resistance And Corrosion Resistance, And Fire Resistance Grade A1. Good Color Retention, Long Service Life.

3

 

 

dffg (2)

Application:
Applicable To Food, Textile, Chemical Industry, Electronics, Machinery, Logistics And Other Production Workshop, Office Building, Warehouse, Laboratory, Surface Coating, Especially Suitable For The First Floor, Basements, Underground Parking And Other Relatively Moist Environment.

oi


  • Previous:
  • Next:

  • 1.Question: How much paint do I need to paint my room?
    Answer: For interior wall paint, 10kgs can brush around 100-120㎡after brush twice.

    2.Question: How many KG of powder can put in a 20’ ctnr?
    Answer: We can use cartons for painting powder, and the buckets by separate, piled the buckets together for save space, it can fill in about 8600kgs powder and 860 buckets in a 20’ctnr.

    3.Question: How long does it take for paint to dry in between coats?
    Answer:The amount of time it takes for paint to dry would depend on a number of external factors such as room temperature and weather. In general, it can be said that the surface will be dry within 30-50 minutes. However, coatings fully cure in five (5) days regardless of type.

    4.Question:Does HESHIDA® have odorless interior paint?
    Answer: Our interior paints are environmental friendly and odor-less paints.

    5.Question:Is there a proper order when painting interiors or a room?
    Answer:When painting a room, it is recommended to start with the ceiling. Followed by walls, trims and fixtures. And finally, the floor as needed.

    6.Question:Is there a proper order when painting exteriors?
    Answer:Similar to painting interiors, when painting a structure’s facade, it is recommended to start at the highest point. Paint each side, one at a time. Finish off by painting the trim.

    7.Question:What do I do with leftover paint?
    Answer:If you have leftover paint or chemicals, they should never be dumped into drains or open bodies of water. You may donate them to charity.

    8.Question:How can I be a dealer/distributor of HESHIDA® Paints?
    Answer:For dealer/distributor related/business transactions, you may coordinate with us by sending us your complete name, address, contact details and request at wangyanzhao@hebeicopihue.com or shiner@hebeicopihue.com

  • Write your message here and send it to us